GM2 Logo
 

Hydrologic Analysis of the Mill River along CT Route 31 – Coventry, CT

Mill River Hydrologic Analysis

GM2 gathered, created and compiled all hydrologic values for the creation of a TR-20 model for hydrologic analysis of a drainage basin with 5 sub-basins. Total basin size was 3.25 sq. mi. This job included hydrograph routing through a gate outlet from a 363-acre lake. The project included five design points for hydrograph generation. GM2 is fully versed in Connecticut regulations for hydraulics and drainage, and we have experience with nationally accepted industry standards, as well as various Federal Highway Administration publications involving hydraulics, hydrology and scour.

‹- Previous Project  |  Hydraulics & Drainage Overview  |  Next Project -›