Construction Inspection
GM2 Associates, Inc. provides reliable, expert construction inspection
for municipalities, state agencies, and private developers. The inspection
staff has the strength of 14 NICET inspectors and is supported by dedicated
office engineers who themselves are expert inspectors in their own right.
GM2 takes inspection very seriously, recognizing that its staff and the
firm have the awesome responsibility of acting as the agent for the Commissioner
of Transportation for the CT DOT on many of its assignments. Likewise,
on municipal projects GM2 is counted on to ensure that bridges and roads
are built in accordance with contract plans and specifications. GM2 has
developed a hard-earned reputation in inspection as both a sub-consultant
and as a prime.
Recent Examples of Work Include:
Interstate I-95, Contract C-1 – East Haven, CT
Approximately 1.6 miles of I-95 was reconstructed and widened in both
directions, including full shoulders, a new median barrier, and new drainage,
signing and lighting. The East Haven Frontage Road system was reconstructed and
widened to accommodate additional lanes on I-95. Several bridges and culverts
were replaced and/or widened. GM2 was Sub-Inspector. Construction cost:
$40 million. Click here for photos.
Interstate I-95, Contract C-2 – New Haven, CT
Approximately 1.0 mile of I-95 was reconstructed and widened in both directions,
including full shoulders, a new median barrier, and new drainage, signing
and lighting. A new Woodward Avenue/Stiles Street interchange was constructed.
Woodward, Townsend, Forbes Avenue, and Fulton Terrace bridges were replaced.
GM2 was Sub-Inspector. Construction cost: $60 million. Click here for
photos.
Northeast Utilities 345 KV Line – Bridgeport to Norwalk,
CT
17 miles of state right of way (Route 1) and city roads (Bridgeport, Fairfield,
Westport, and Norwalk) were trenched to accommodate the new NU 345 KV high-energy
line to service Fairfield County. GM2 was Prime Inspector. Construction cost:
$175 million.
The Pearl Harbor Memorial Bridge Replacement, Contract B
Approximately 3000 feet of hybrid steel curved girder viaducts and the main Extradosed
Span will be replaced, with a total of 10 lanes. GM2 is a Sub-Inspector. Construction
cost: $650 million.
East Hartford Roadway Improvements Phase II and III – East
Hartford, CT
The project involved nearly 40 miles of local town roadway resurfacing, milling,
paving, partial patch, crack sealing and drainage improvements. GM2 was Sub-Inspector
(Phase II) and Prime Inspector (Phase III). Construction cost: $25 million.
The Whitehead Highway and Columbus Boulevard – Hartford, CT
This project involved reconstruction and widening of Columbus Boulevard
and approach roadways in the vicinity of the Columbus Boulevard Bridge
over the Whitehead Highway. Turning lanes were added and driveway
entrances improved. Landscaped sidewalks and medians, along with roadway
illumination and new, upgraded traffic signals will be provided. Also
involved reconstruction and widening of the Columbus Boulevard Bridge
and approach roadways. GM2 was Sub-Inspector. Construction cost: $20
million. Click here for photos.