GM2 Logo
 

Stone Mill Road Bridge – Mansfield, CT

Proposed new design for Stone Mill Bridge

GM2 is designing a replacement structure for the existing two-span Stone Mill Bridge. The bridge site, located approximately 35 feet from the historic Grist Mill Building, makes aesthetics an important consideration for the new bridge. Pending final approval from the town, the replacement structure will consist of a two-span concrete arch with a stone masonry facing to compliment the historic surroundings. Existing structure shown below.

Existing Stone Mill BridgeExisting Stone Mill Bridge

‹- Previous Project  |  Bridge Engineering Overview