Route 2 WB over I-84 – East Hartford, CT

Ten-span curved steel box girder viaduct bridge, 1600 feet long.

A 1,600-foot ramp structure consisting of 10 spans with curved and straight segments. The superstructure consists of twin box girders and a reinforced concrete deck. Piers are single circular concrete columns with cantilever cap. Construction is complete. Final cost of the bridge was $11,300,000. Personal experience of Madan Gupta, designed for Parsons Brinckerhoff.